Files
AnimeTV-Frontend/.gitea/workflows/ci.yml
Vivy Bot 5f3a40df8a
Some checks failed
Integration Tests / integration-tests (pull_request) Failing after 47s
👷 ci: add build and lint checks to CI
2026-02-07 17:30:20 +07:00

29 lines
519 B
YAML

name: Integration Tests
on:
pull_request:
branches:
- main
jobs:
integration-tests:
runs-on: ubuntu-latest
steps:
- name: Checkout repository
uses: actions/checkout@v4
- name: Setup runtime environment (Bun)
uses: oven-sh/setup-bun@v1
with:
bun-version: latest
- name: Install dependencies
run: bun install --frozen-lockfile
- name: Linting test
run: bun run lint
- name: Build test
run: bun run build